INSTALLATION PORTFOLIO
COIL is working diligently to accelerate our nation’s transition to EV mobility. Whether you’re an individual resident wanting to upgrade your home with EV charging or an industry giant looking to update your company's parking assets, COIL provides an array of managed charging solutions for everyone.
Our portfolio for EV charging infrastructure is extensive and continually growing alongside the industry’s increasing demand. COIL is here to make EV mobility possible, one installation at a time.
Below is a showcase portfolio to give you an example of our high-quality standards.
FLEET CASE STUDY
NUVVE
The Cutler-Orosi Joint Unified School District in California partnered with COIL and Nuvve to install the necessary charging infrastructure for their electric school bus fleet.
COIL designed and implemented a comprehensive charging solution, installing 14 Level 2 Nuvve chargers to ensure the buses remain fully charged and ready to serve students daily.
BUSINESS PARKING LOT
WALLBOX
COIL installed seven pedestal-mounted Pulsar Plus chargers at the Wallbox headquarters in Arlington, Texas! Our solutions are end-to-end, meaning COIL is with you every step of the way. Our team of EVSE experts will look at your current infrastructure, design the best-tailored EV charging solutions, and install the EV chargers at your property.
Want to learn more about our EV charging solutions for businesses?
DCFC / LEVEL 3
OWL / PILOT
COIL worked with OWL to install two DCFC chargers at this Pilot gas station. The scope of work included trench work and framing to ensure all of the conduits were in the correct position for when the switchgear was placed. Our team also poured concrete footings to hold up the large GM canopy. No job is too large for COIL's team of expert EV charging installers.
Want to learn more about our commercial EV charging solutions?
HOTEL / PUBLIC PARKING
TESLA O+O
COIL installed nine Tesla charging stations at this hotel's public parking lot for guests to utilize during their stay. One of the parking assets was made to ADA-compliant standards and and additional three stalls were made EV-ready for future electrification.
Want to learn more about our EV charging solutions for businesses?
MULTI-UNIT DWELLINGS
ENEL X
COIL completed the installation of 34 Enel X JuiceBox Pro 32 chargers in an underground garage. The multi-unit dwelling is located at 1 Bristol Ct. on Treasure Island in San Francisco. The project included two ADA-compliant parking stalls and 14 power poles, each with two chargers, for a total of 34 charging stations.
Want to learn more about this project?
DCFC / LEVEL 3
EV GATEWAY
Our installation of three 60kW DCFC Tellus chargers was a big milestone for COIL.
Using an existing utility transformer, our field team installed a 600A 208/120v switchgear, a 225 kVa transformer, and a 400A 480/277v panel as the infrastructure components. We utilized our expertise in EV design to value-engineer our installation with code compliance and ADA access in mind.
Want to read more about this project?
CONTACT US
Talk with a COIL Representative today!
Schedule a consultation with a COIL representative to get started on your EV charging project.
Get Charging
Toll-Free Phone
866-734-2645